← BIMEA Construction
Sewer system — Bella Vista Plaza shopping center

- Status
- Completed
- Year
- 2025
- Location
- Bella Vista, Buenos Aires
- BIMEA's role
- Design and construction
- Client
- Bella Vista Plaza
The developer hired us to solve the project’s sewage discharge. Because the site sat at a low point, we designed, engineered and built a sewage pumping station and 500 m of force main to AySA’s gravity sewer.



