← BIMEA Construction

Sewer system — Bella Vista Plaza shopping center

Sewage pumping station at Bella Vista Plaza
Status
Completed
Year
2025
Location
Bella Vista, Buenos Aires
BIMEA's role
Design and construction
Client
Bella Vista Plaza

The developer hired us to solve the project’s sewage discharge. Because the site sat at a low point, we designed, engineered and built a sewage pumping station and 500 m of force main to AySA’s gravity sewer.

Sewer works in Bella Vista
Laying the force main
Sewer works in Bella Vista
Sewer works in Bella Vista